With the hot summer weather setting in, it is getting more difficult to be moving rocks and digging dirt under the sun. Slowly we are making progress moving the flowers and shrubs from the old layout into new flower gardens. The hills and valleys are being levelled and when the weather cools down the old layout will be seeded with grass. I have finished the elevated track and retaining wall on one side of the layout. I have moved the retaining stones in place but it will take a couple more weeks to get everything to grade and the track connected.
Sunday, June 19, 2016
Train Bridge 2016 - in G-Scale Garden Train Land - 06-19-16
Blog Entry & Photos by Bob
With the hot summer weather setting in, it is getting more difficult to be moving rocks and digging dirt under the sun. Slowly we are making progress moving the flowers and shrubs from the old layout into new flower gardens. The hills and valleys are being levelled and when the weather cools down the old layout will be seeded with grass. I have finished the elevated track and retaining wall on one side of the layout. I have moved the retaining stones in place but it will take a couple more weeks to get everything to grade and the track connected.
With the hot summer weather setting in, it is getting more difficult to be moving rocks and digging dirt under the sun. Slowly we are making progress moving the flowers and shrubs from the old layout into new flower gardens. The hills and valleys are being levelled and when the weather cools down the old layout will be seeded with grass. I have finished the elevated track and retaining wall on one side of the layout. I have moved the retaining stones in place but it will take a couple more weeks to get everything to grade and the track connected.
Subscribe to:
Post Comments (Atom)
Wow! It is looking real good!
ReplyDelete