Saturday, July 23, 2016

Train Loop Finally Connected in G-Scale Garden Train Land - 07-23-16


Photos and Blog Entry by Bob

June and July have been unbearably hot with no rain for two months and the temperature with humidex normally reaching near 40 degrees C everyday.  Work had ground to a halt for finishing the layout except for the rare times at dusk.  With a bit of a cooler weekend, we pushed through the heat to move some sod, dig up the dirt, place the rocks and grade the last pieces of track.  Although there is some fine grading and levelling that need to be done we are ready to start running trains again!!!




 photo 02-IMG_6891_zps013vya0g.jpg

 photo 03-IMG_6890_zpswv3wxaby.jpg

 photo 04-IMG_6888_zpsdxwqcf5n.jpg

 photo 05-IMG_6887_zps9xjhje9e.jpg

 photo 06-IMG_6886_zpsdu59qcjo.jpg

 photo 07-IMG_6885_zpsbfumz9eu.jpg

 photo 01-IMG_6893_zpst5ifxovp.jpg

1 comment: